Peck Drilling
Voortman will install and calibrate your machine once he is done. Then, he will meet with your operators and take them through the simple but comprehensive training program. They will be trained in:
AC Unit Mounted on Electrical Cabinet. The unit is located on the cabinet's High-Power (480v) side. It is located close to where the drives are installed. This allows for faster heat dissipation and keeps the cabinet's temperature stable. All axes have servo drives that are the main contributors to heat in the electrical cabinet.